JLN Engineers develops clear, concise, correct, and complete specifications that translate project needs and engineering decisions into documented requirements for services, products, materials, fabrication, installation, inspection, and testing, as applicable. Specifications establish performance criteria, technical requirements, and acceptance criteria, coordinated with drawings, calculations, and referenced standards. Review and revision control support consistency, traceability, and verification of the completed work.
- Define scope and intended use
Identify the service, product, or work to be specified, its intended use, interfaces, and responsibilities.
- Gather requirements and references
Collect client needs, design inputs, applicable requirements, and reference documents; record their sources and revisions.
- Establish performance and acceptance criteria
Define performance, technical, inspection, and testing criteria that allow conformance to be evaluated.
- Draft specifications
Organize requirements using consistent terminology and an appropriate specifying method; state each requirement in its intended location.
- Coordinate engineering documents
Check specifications against drawings, calculations, and related documents; resolve conflicting, duplicate, and missing requirements.
- Review criteria satisfied?
Review for clear, concise, correct, and complete requirements and coordination. Resolve findings before approval and issue.
- Approve and issue revision
Obtain the required review and approval, identify the revision and issue purpose, and distribute the controlled documents.
- Evaluate feedback and changes
Evaluate fabrication, installation, inspection, testing, and service feedback. Assess changes and return affected requirements and documents for coordination and review.
- Clear
- Use direct language and consistent terminology so the intended requirement can be understood without ambiguity.
- Concise
- Remove unnecessary wording while retaining the detail needed to communicate the requirement accurately.
- Correct
- Check technical accuracy, units, references, and agreement with the engineering basis and related documents.
- Complete
- Include the requirements, interfaces, responsibilities, and acceptance information needed for the defined scope.